Possible change

A potential change refers to an unapproved design change to the program baseline that, if approved, would result in a change to the mass characteristics of a system. Such changes can have a significant impact on the performance and design of the system and must therefore be carefully reviewed and evaluated.

Approval process

In contrast to approved changes, a potential change has not yet gone through the approval process. This means that the proposed change has not yet been officially accepted or integrated into the planning. It may still be in the evaluation phase, in which its feasibility, costs and impact on the system are examined.

Effects on mass properties

Possible changes can affect the mass properties of a system in various ways. Such changes can alter the weight, center of gravity or moment of inertia of the system, which in turn can affect the performance and behavior of the system.

Classification of changes

Changes that lead to an increase in mass are referred to as risks or threats. Increased mass can impair the efficiency of the system, cause additional costs or reduce performance.

Changes that lead to a reduction in mass are seen as opportunities. Reduced mass can improve efficiency, increase performance or save costs.

Evaluation and analysis

The evaluation of possible changes includes a detailed analysis of the impact on the system. This may include running simulations, tests and cost-benefit analyses to understand the pros and cons of the proposed change.

Decision making

The decision on whether to approve a potential change is based on the results of the assessment and analysis. It is important to consider all relevant factors, including technical feasibility, cost, impact on schedule and potential benefits to the system.

Integration into project management

If a potential change is approved, it must be integrated into the official project documentation and planning. This includes updating reports on mass properties, adjusting schedules and budgets and communicating the changes to all relevant stakeholders.

Summary

Potential changes are an essential part of change management in complex projects. They require careful evaluation and analysis to ensure that all potential impacts on the system and the project as a whole are taken into account. A structured approval process can ensure that only changes that make a positive contribution to the success of the project are implemented.

en_USEnglish